What is the distance (in metres) from area III to area I in this new facility?


A) 0
B) 10
C) 20
D) 30
E) 40

F) D) and E)
G) B) and D)

Correct Answer

verifed

verified

With group technology items that are similar in either design or manufacturing requirements are grouped into part families.

A) True
B) False

Correct Answer

verifed

verified

In designing the layout of retail facilities the primary objective is to minimize cost.

A) True
B) False

Correct Answer

verifed

verified

The linking of a broad range of manufacturing and other activities through an integrated computer system is referred to as:


A) automation.
B) computer-aided design (CAD) .
C) computer-aided manufacturing (CAM) .
D) computer-integrated manufacturing (CIM) .
E) a flexible manufacturing system (FMS) .

F) None of the above
G) D) and E)

Correct Answer

verifed

verified

Which type of automation is designed to achieve rapid changeover times when switching from one product to another?


A) Fixed automation
B) Manual automation
C) Robots designed for repetitive, standardized tasks
D) Flexible manufacturing systems
E) All choices have comparable changeover times.

F) A) and B)
G) C) and D)

Correct Answer

verifed

verified

Flexible manufacturing systems (FMS)are intended to automate routine work tasks in high volume,low variety mass production industries such as the auto industry.

A) True
B) False

Correct Answer

verifed

verified

Given the following line balance data: Given the following line balance data:    -For eight hours of operating time per day and a desired output rate of 960 units per day,what is the minimum number of stations needed to achieve the appropriate cycle time? -For eight hours of operating time per day and a desired output rate of 960 units per day,what is the minimum number of stations needed to achieve the appropriate cycle time?

Correct Answer

verifed

verified

The overall goals of CIM include all of the following EXCEPT?


A) To achieve rapid response to customer orders
B) To allow rapid production
C) To reduce indirect labour costs
D) Accommodate increased product variety
E) To achieve rapid response to product changes

F) C) and E)
G) A) and C)

Correct Answer

verifed

verified

In which type of processing system would sugar refining be done?


A) Job Shop
B) Batch
C) Assembly
D) Continuous
E) Repetitive

F) A) and B)
G) A) and E)

Correct Answer

verifed

verified

The main issue in the design of process layouts concerns the relative positioning of:


A) workstations.
B) processing components.
C) departments involved.
D) entrances, loading docks, etc.
E) manufacturing cells.

F) B) and C)
G) A) and E)

Correct Answer

verifed

verified

In a process flow diagram,the diamond shape shows which of the following?


A) Events of interest
B) Decision points
C) Possible failure points
D) Inventory delays

E) B) and C)
F) None of the above

Correct Answer

verifed

verified

A possible disadvantage of a product layout is an inflexible response to changes in product mix.

A) True
B) False

Correct Answer

verifed

verified

"Balance delay" is another name for the percentage of idle time in a product layout.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not usually true about process layouts?


A) They involve frequent adjustments to equipment.
B) There is a discontinuous work flow.
C) Variable-path material-handling equipment is used.
D) Highly specialized equipment is used.
E) Workers are usually skilled.

F) B) and E)
G) A) and C)

Correct Answer

verifed

verified

Some of the benefits of cellular layouts are less material handling and reduced setup time.

A) True
B) False

Correct Answer

verifed

verified

For output to equal forecasted demand,what will be the second task performed at the second workstation of the production line that uses the fewest number of stations?


A) A
B) B
C) C
D) D
E) E

F) All of the above
G) A) and E)

Correct Answer

verifed

verified

A production line is to be designed for a job with three tasks.The task times are 0.6 minutes,1.8 minutes,and 1.2 minutes.If the necessary cycle time is 1.2 minutes per unit,what is the theoretical minimum number of workstations?


A) 2.0
B) 3.0
C) 3.6
D) 4.0
E) None of the choices are correct.

F) B) and E)
G) A) and D)

Correct Answer

verifed

verified

For output to equal projected demand,what will the percentage idleness be of the production line that uses the minimum number of workstations?


A) 10%
B) 5%
C) 3%
D) 1%
E) 0%

F) C) and D)
G) B) and E)

Correct Answer

verifed

verified

What is the total flow (loads per week) between department Y and department Z?


A) 140
B) 160
C) 200
D) 250
E) 300

F) D) and E)
G) C) and D)

Correct Answer

verifed

verified

What is the distance (in metres) from area IV to area II in this new facility?


A) 0
B) 5
C) 10
D) 15
E) 20

F) B) and E)
G) A) and D)

Correct Answer

verifed

verified